Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts

Removal of Green Canyon 6A Platform







Versabar's VB 10,000 lift system was used in the decommissioning of a 2,600-ton topside in the Gulf of Mexico. Once the four point hook-up was complete, the legs were cut, and the deck lifted from its jacket, the VB 10,000 used its GPS thrusters to navigate away from the jacket, carrying the topside to a transport barge. The deck was then lowered and sea-fastened to the barge for departure.





















































Related Posts Plugin for WordPress, Blogger...